Skip to content
Opened April 2019
4–7kVA per cabinet
Full racks and part racks available (quarter, half and per U)
Part of the Equinix Slough Campus, LD4/5/6/7 and 10
- The original Redbus Docklands facility
- Retrofitted office building
- Strong carrier list, now combined with 8&9 HEX
- LINX PoP
- Well-established facility
- Strong network choice
- Limited capacity and power per cabinet
- Colo-X able to source via existing clients
- Formerly Telecity Powergate
- Acquired by Equinix in 2016
- Opened March 2009
- 4kW per cabinet as standard, 20kW possible
- Growing carrier list, LINX node
Originally opened by IO Data Centres in 2015
Acquired by Equinix in February 2017
Part of the Equinix Slough Campus, cross-connect to LD4/5/6/7
80% of the site now part of xScale hyperscale focussed jv with GIC
The leading network node in the UK outside of London
Opened in 1998, the first Telecity data centre
Power and capacity limited
Leading LINX site
Opened in 2006 as IFL, Internet Facilitators
Acquired by Telecity in July 2010
Equinix bought Telecity in 2015
Strong carrier and network list
High occupancy
Opened under Telecity in Q4 2012
3.5MW customer power
LINX and AWS Direct Connect site
Now one of four Equinix Manchester data centres
Opened in 2007 by UKGrid
Acquired by Telecity in 2011
Telecity acquired by Equinix in 2015
Close to Equinix MA1/Williams House
Usual Equinix accreditations
Due to open summer of 2022
MA5 with MA6 significant 30MW combined
Phase 1 MA5 is 6MW, 1440 cabinets
Located 3 miles north of Equinix MA3
- 400 rack, 11,000 sq ft data centre
- Former Hardy Fisher data centre, acquired by Atlas Edge in 2022
- Relaunched in 2023 further to a complete £13m refurbishment
- Now a high-quality, 200-rack, Tier 3 facility
- Huge purpose-built facility of 450,000 sq ft net tech
- Next door to Telehouse
- Opened 2002
- Sold on a leasehold basis to large-scale tenants
- Almost adjacent to Telehouse
- Opened 1999
- Large-scale suites sold to carriers and hosting providers
- Limited per-rack colocation
- Up to 30,000 sq ft of net technical capacity possible
- Diverse 5MVA power feeds
- 50km from London Docklands
- Tier 2 facility on Southern Industrial Estate, Bracknell
- Connectivity diverse of central London
- 8Amps per cabinet max
- Now under Interoute since 2015
- 44,000 sq ft facility
- Retail focused colocation data centre
- Opened 2013
- Scope for bespoke suite solutions
- Proposed 120,000 sq ft data centre in former Olympic Media building
- Needs a large lead client to bring it to market
- Ideally located for the City or Canary Wharf
- Standard wholesale capacity on long-term leases
- Retail colocation services via existing tenants
- New regional UK facility opened May 2018
- Up to 500 racks/2MW IT load
- 24/7 on-site support and security
- Well located for Bristol/Birmingham/SW Midlands
- Well-established facility opened in 2001
- Close to the City
- Just under 50,000 sq ft of net technical capacity
- LINX site, good carrier access
Page load link