Gyron, 3 Centro, Boundary Way, Hemel Hempstead, Hertfordshire,
HP2 7SU
Colo-X analysis
The NTT HH1 or Centro data centre was originally built and developed by Gyron as their first self-built facility in 2009. The single-storey data centre offers decent mid-density colocation across a number of dedicated halls in a refitted modern industrial building.
With Gyron being acquired by NTT in June 2012, Centro remains well suited to retail colocation rack users. This is in contrast to the other two Gyron Hemel Hempstead data centres nearby (now NTT HH2 and HH3) where the focus is on large-scale dedicated suites at 1MW or above, and where parent NTT offers retail colocation services to smaller users. In summary, this is a good-quality mid-density site at an attractive price point.
NTT Global Data Centers Hemel Hempstead 1 facility description
The first phase of 120 cabinets went live in June 2009 and was totally sold out by May 2010. Phase 2 provided a further 600kW or 120 cabinets, and a final third phase added 1MW or 200 cabinets.
Worth remembering Dimension Data (now integrated into NTT Ltd) also part of the NTT family for onsite hardware provision and support.
Technical stats
Size | 15,000 sq ft of net technical capacity |
Total customer power | 2MW |
Percentage occupied | 90% |
Operational since | 2009 |
Installed clients | 40 |
Networks available on site | 5 |
Standard power | 5kW per rack |
24/7 on-site support | Yes |
24/7 access | Yes |
Pricing |
We usually supply costs and information within 60 minutes during office hours.