Skip to content
- Formerly Telecity Millharbour
- Acquired by Digital Realty Trust (DRT) in 2016, with plans for big expansion
- Long-established site, LINX node
- Good connectivity choice for small site
- Low on power per rack/metre
- 4MW/40,000 sq ft 'extention' to DRT Bonnington House
- First phase opened summer 2020
- Campus-cross connect to all four DRT Docklands Data Centre
- Modern, high quality specification Docklands data centre
- Formerly Telecity Meridian Gate (MER)
- Acquired by Digital Realty Trust (DRT) in 2016
- Well-connected Docklands facility
- LINX PoP
POPULAR WITH COLO-X CLIENTS
- Acquired by Digital Realty Trust in 2016
- Well-established facility
- Good carrier choice, AWS Direct node
- LINX PoP
- Small-scale site opened in 2011, next door to LHC
- 1.5MW customer power, about 300 racks
- 4000 sq ft of offices available, good for DR
- The original Redbus Docklands facility
- Retrofitted office building
- Strong carrier list, now combined with 8&9 HEX
- LINX PoP
- Well-established facility
- Strong network choice
- Limited capacity and power per cabinet
- Colo-X able to source via existing clients
- Huge purpose-built facility of 450,000 sq ft net tech
- Next door to Telehouse
- Opened 2002
- Sold on a leasehold basis to large-scale tenants
- Almost adjacent to Telehouse
- Opened 1999
- Large-scale suites sold to carriers and hosting providers
- Limited per-rack colocation
Re-opened 2017 under new ownership
500 metres from Telehouse
Great value kW, ideal for smaller users
Sub rack 1/4 and 1/2 options
- Part of the Telehouse Docklands campus
- 60,000 sq ft across five floors
- Lots of carriers and ISPs
- Some refurbished space now able to run 2kW per cabinet
- 100,000 sq ft of net technical capacity
- The leading network ecosystem in Europe
- ISO 27001, PCI DSS compliant, stand-alone campus
- Power from 2kW to 3.5kW per cabinet
- 24/7 access, on-site support and security
Newest Telehouse building, opened Q4 2016
80,000 sq ft of net technical capacity, 16MW IT load
4.5kW per cabinet on average
AWS Direct Connect Location
24/7 access, on-site support and security
Due to open Q2 2022
15MW IT load across 6 floors
Campus cross-connect to Telehouse Coriander Avenue
500 metres distance to Telehouse West
- Opened March 2010
- 50,000 sq ft of net tech
- 1.5kW/sq m, up to 6kW per cabinet
- Fast-growing LINX site
- Opened early 1999
- Good carrier choice
- Carrier-owned but carrier-neutral for colocation
Page load link