London and South East England data centres

Interxion LON1

  • Well-established facility opened in 2001
  • Close to the City
  • Just under 50,000 sq ft of net technical capacity
  • LINX site, good carrier access

Interxion LON3

  • 3rd Interxion London data centre, opened 2019
  • Adjacent to LON1 and LON2
  • 20,000 sq ft net, retrofitted building
  • LINX site, good carrier access

Kao Data Park Harlow

  • 36MW wholesale focussed campus (with retail options)
  • First building went live Q1 2018
  • Campus of four buildings of 8.8MW each
  • M11/North London location
  • Netwise London East

    • Opened May 2022
    • 10,000 sq ft net technical capacity, 260 racks
    • Ideal for quarter or half racks and full cabinets
    • Dual and diverse connections into Docklands

    Netwise Bermondsey

    • 11,000 sq ft gross site space
    • 6,000 sq ft net technical capacity, 200 racks
    • Suitable for 1U, quarter racks, half racks and full cabinets
    • Dual and diverse connections into Docklands

    NTT Global Data Centers Hemel Hempstead 3

    • NTT/Gyron's huge new Hemel data centre opened 2016
    • 100,000 sq ft/20MW of net technical capacity
    • Very high quality retail colocation from NTT
    • Large-scale dedicated halls of 1MW+ from Gyron
    • High-power rack densities, 20kW possible
    Go to Top